NEC 705.12 Solar & Battery 120% Busbar Rule Calculator

NEC 705.12(B)(3) / 705.28(A) • Max PV/ESS Backfeed Breaker, Main Breaker Derate & Permit-Ready PDF

100% Client-Side
Presets:
Step 1NEC 705.12(B)(3)

Main Panel Busbar, Main Breaker & Placement

Check panel door nameplate
A bus
A main
Step 2NEC 705.28(A) & 240.6(A)

Solar PV & Battery (ESS) Backfeed

Inverter Output Unit (240V AC)
kW
Continuous Output: 31.67A (7.60 kW) × 125% = 39.58A minimum OCPD
Required Standard Backfeed Breaker (NEC 240.6(A)): 40A
Required Permanent Panel Label (NEC 705.12(B)(3)(2))

“WARNING: INVERTER OUTPUT CONNECTION; DO NOT RELOCATE THIS OVERCURRENT DEVICE”

PASS
240A / 240A max

Frequently Asked Questions — NEC 705.12 Solar 120% Busbar Rule

Key code rules for load-side PV/ESS interconnections, main breaker derates, and AHJ solar permitting.

Under NEC 705.12(B)(3)(2) (formerly 705.12(D)(2) in NEC 2017), the sum of the main service breaker and all solar/battery backfeed breakers may not exceed 120% of the panel busbar rating—provided the solar backfeed breaker is installed at the opposite end of the busbar from the main breaker and the required permanent warning label is applied. On a standard 200A panel (200A busbar / 200A main), that allows up to 40A of solar backfeed (200 × 1.20 − 200 = 40A).